Installation

      

                                      
TRANSPORT AND INSTALLATION - Transportation to site is undertaken by means of low-step articulated lorries complete with integral hiab crane. The crane is then employed at the location to lift the unit/units into their designated position. In the normal manner, transportation costs will vary in respect of total mileage undertaken from factory to location. Installation requirements and associated costs can also vary where access to the final site is less straightforward than a standard installation. Prior liaison with the prospective venue managers and in certain cases a site visit, usually provides information sufficient enough to ensure delivery and installation is as smooth as possible. Paving stones are the only requirement where the unit is to be placed on to a grass surface. The integrated electrical system can be powered direct from the mains or from a small portable generator as shown below - usual capacity 2.5 to 3 kvolts. *Typically, after arrival a standard installation will be complete - and the unit ready for play - in around 30 minutes.

*HOLDING DOWN MECHANISMS - In areas where extreme adverse weather or winds may be a factor, we recommend the use of ground-based holding down mechanisms. We believe we have sourced the simplest and most effective implements for this purpose. Details available on request.